Autoplay
Autocomplete
Previous Lesson
Complete and Continue
Application training for V2 tank
Pretreatment set up
Arriving to a Job (1:13)
Filters and Thermostats (1:24)
Indicator Strips (0:47)
Verifying Fog Tank Is Off (0:52)
Compressor Setup (1:39)
Dividing Spaces With Plastic (1:13)
V2 machine set up
Mixing Chemical (1:16)
Running Hoses (1:21)
Attaching Heads (1:51)
Step 1
Wipe Down Treatment (1:26)
Turning on the Device (1:01)
Treating the HVAC System (2:00)
Room to Room Treatment (1:01)
Waiting on Step 1 (0:56)
Flushing the Lines (1:10)
Step 2
Settings for Step 2 (1:17)
Mixing Goldshield (1:05)
Applying Protectant (1) (1:06)
Cleanup
Clearing your Hoses (1:22)
Clean up the tank (1:29)
Cleaning Fog Heads (1) (1:31)
Final Walk Through (1) (1:17)
Mixing Goldshield
Lesson content locked
If you're already enrolled,
you'll need to login
.
Enroll in Course to Unlock